Case studies · Data centre

Liquid-cooled AI hall in a tropical industrial estate

Cooling, power and energy metering designed together so the first phase could open before the full grid connection.

  • Thailand
  • Data centre

Key facts

Region Southeast Asia
Scope Cooling, power, metering
Status Phase one live

Overview

Data centre

Cooling, power and energy metering designed together so the first phase could open before the full grid connection.

Region Southeast Asia
Scope Cooling, power, metering
Status Phase one live
01

Site and load study

Climate data, grid quality and load profile are modelled before equipment is specified.

02

Phased hall build

Cooling and power modules commissioned in blocks that match the arriving compute.

03

Energy operations

Metering, tariff logic and maintenance calendars handed to a named operating team.

Solutions

Green AI infrastructure

A modular hall built around liquid-cooled racks, on-site solar and storage, and metering that shows where every kilowatt goes.

Data centre developers, telco operators, AI platform providers

Related reading

Deployments in the field

Utility systems, data centre energy and campus operations. Each entry states what was built and what changed.

Bring us your load profile

Share the site, the load and the constraint. We will come back with an architecture and a delivery path.